Beer On Tap

Keg-orator is up and running and for the most part complete.  When we are fully up and running our three primary beers, Between the Pipe – Double IPA, Sweet Lilly – Blonde Ale and a Stout (still a work in progress) will be on tap.

 

I started the build by tearing apart a new fridge.  The plan being move the refrigeration system into this old metal industrial box that McCrae and I dragged home from the woods years ago.  McCrae and I had planned to turn it into something we saw at the contemporary art museum but we never finished it.  Chase came up with the idea of turning it into a keg-orator.  The original box was much bigger and McCrae and I had cut it in half vertical and horizontally and welded it back together making it smaller, but this is where the project ended.